I-90 – SR 18 Interchange Improvements, WA

Image credit: © WSDOT

AAR Testing and Inspection, a SOCOTEC Company, provided construction materials testing, special inspections, and quality assurance services for the I-90/SR 18 Interchange Improvements project, supporting a major transportation infrastructure upgrade in Snoqualmie Valley, Washington.

Key Information 

Project Name: I-90 – SR 18 Interchange Improvements

Client: Aecon Pacific Northwest

Owner: Washington State Department of Transportation 

Reference Contact: Kathleen Mahon, Project Manager, Aecon  

Funding: $125 Million 

Location: Snoqualmie Valley, WA

Services Provided:  Construction Materials TestingSpecial Inspection, QA/QC Oversight

background dark blue

Talk to our experts

Chris CHRISTENSEN

Division Principal

Redmond, WA

Division Principal

Chris.Christensen@socotec.us +1 425 750 6953

The Challenge 

Supporting a Major Highway Interchange Improvement in Washington State

The I-90/SR 18 Interchange Improvements project is a Washington State Department of Transportation (WSDOT) initiative designed to reduce congestion, improve traffic operations, and enhance safety at one of southeastern King County's busiest highway interchanges.

Due to significant growth in the Snoqualmie Valley, bottlenecks and backups at the existing interchange and along SR 18 had long created travel delays and safety concerns for commuters and freight movements.

The project consists of a strategic design and roadway expansion that replaces the existing interchange with a diverging diamond interchange (DDI) while widening more than two miles of SR 18. Additional improvements include new bridges, upgraded traffic movements, replacement of fish passage barriers with open-channel streams, and enhancements to wildlife habitat connectivity.

Delivering these improvements presented several construction challenges, including maintaining traffic flow adjacent to active interstate lanes, coordinating phased construction activities, and working within terrain and environmental constraints involving multiple creeks and drainage systems.

background dark blue

The Solution

Construction Materials Testing and Quality Oversight Throughout Construction

Construction inspectors conducting a bridge structure inspection beneath an overpass as part of the I-90 – SR

AAR TESTING AND INSPECTION, a SOCOTEC Company, supported the project by providing construction materials testing, special inspections, and quality assurance services throughout critical phases of construction.

Building on its Design-Build experience during the SR-520 program, AAR implemented an integrated approach to inspection staffing, reporting, and project coordination to support work within a highly constrained interchange environment.

Services provided included:

  • Construction materials testing for pavement, structural concrete, and soils 
  • Quality inspections during bridge widening, structural steel placement, and DDI-related components 
  • QA/QC oversight during phased construction adjacent to live interstate traffic 
  • Field density testing, grading verification, and compaction monitoring 
  • Inspection coverage for stormwater systems, drainage structures, and subgrade preparation 
  • Daily coordination with contractor leads and WSDOT inspectors to maintain traffic flow 
  • Verification of geometry, tolerances, and elevations for DDI transitions 
  • Documentation and reporting aligned with refined Design-Build processes  

Project activities were performed during phased construction adjacent to live interstate traffic while supporting coordination throughout the project's evolving construction sequence.

 

AAR TESTING AND INSPECTION, a SOCOTEC Company, supported the project by providing construction materials testing, special inspections, and quality assurance services throughout critical phases of construction.

Building on its Design-Build experience during the SR-520 program, AAR implemented an integrated approach to inspection staffing, reporting, and project coordination to support work within a highly constrained interchange environment.

Services provided included:

  • Construction materials testing for pavement, structural concrete, and soils 
  • Quality inspections during bridge widening, structural steel placement, and DDI-related components 
  • QA/QC oversight during phased construction adjacent to live interstate traffic 
  • Field density testing, grading verification, and compaction monitoring 
  • Inspection coverage for stormwater systems, drainage structures, and subgrade preparation 
  • Daily coordination with contractor leads and WSDOT inspectors to maintain traffic flow 
  • Verification of geometry, tolerances, and elevations for DDI transitions 
  • Documentation and reporting aligned with refined Design-Build processes  

Project activities were performed during phased construction adjacent to live interstate traffic while supporting coordination throughout the project's evolving construction sequence.

 

The Results 

Supporting the Delivery of a High-Impact Transportation Infrastructure Project

Through construction materials testing, inspections, and quality assurance services, AAR TESTING AND INSPECTION, a SOCOTEC Company, supported the delivery of a major transportation improvement project serving the Snoqualmie Valley.

The completed improvements include a new diverging diamond interchange, the widening of more than two miles of SR 18, multiple new bridges, and upgraded roadway infrastructure designed to improve regional mobility.

The project also incorporates environmental enhancements through improved stream crossings and wildlife habitat connectivity while supporting freight, commuter, and recreational traffic throughout the corridor.

By providing inspection, testing, verification, and project documentation throughout construction, AAR supported quality oversight during the phased delivery of this significant Washington transportation infrastructure project.