Ninyo & Moore, a SOCOTEC Company, provided construction materials testing and special inspection services for the Industry Neighborhood Parking Structure, a seven-story, above-grade parking garage development in Salt Lake City, Utah.
Key Information
Project Name: Industry Neighborhood Parking Structure
Client: Q FACTOR
Location: Salt Lake City, Utah
Services Provided: Construction Materials Testing and Special Inspection

Talk to our experts
The Challenge
Construction of a High-Rise Parking Structure with High-Strength Concrete Systems
The project included construction of a seven-story, above-grade parking garage accommodating approximately 1,000 vehicles, with provisions for future commercial tenant space. The structure was supported by driven steel pipe piles and shallow spread foundations, with a reinforced slab-on-grade at Level 1.
Levels 2 through 7 consisted of high-strength post-tensioned concrete decks, which required precise coordination, testing, and monitoring to verify concrete performance, strength gain, and structural integrity throughout construction.
The project scope also included construction of a new private street (Elder Court), connecting 600 South and 700 South, adding further coordination and quality control requirements.

The Solution
Expert Consulting Services for Parking Construction
Ninyo & Moore, a SOCOTEC Company, performed comprehensive materials testing and special inspection services, providing technical support and field oversight throughout construction.
CMT, Inspection and Monitoring Services Provided:
Project coordination, technical support, and construction management
Management of field services by a Utah-registered professional engineer
Evaluation of excavation bottoms and supplemental recommendations
Observation, sampling, and density testing of earthwork, including:
- Structural backfill and subgrade preparation
- Structural fill and aggregate base
Observation of reinforcing steel, anchors, and formwork prior to concrete placement
Documentation of driven steel pipe pile installation
Observation, sampling, and testing of concrete
Development of maturity index curves for high-strength concrete mixes
Maturity meter installations, real-time monitoring, and reporting
Observation of post-tension tendon placement and stressing
Inspection of reinforcing steel and cells prior to grout placement
Sampling and testing of grout, mortar, masonry units, and masonry prisms
Visual inspection and testing during structural steel framing and field welding
Compressive strength testing of concrete and masonry specimens
Ninyo & Moore, a SOCOTEC Company, performed comprehensive materials testing and special inspection services, providing technical support and field oversight throughout construction.
CMT, Inspection and Monitoring Services Provided:
Project coordination, technical support, and construction management
Management of field services by a Utah-registered professional engineer
Evaluation of excavation bottoms and supplemental recommendations
Observation, sampling, and density testing of earthwork, including:
- Structural backfill and subgrade preparation
- Structural fill and aggregate base
Observation of reinforcing steel, anchors, and formwork prior to concrete placement
Documentation of driven steel pipe pile installation
Observation, sampling, and testing of concrete
Development of maturity index curves for high-strength concrete mixes
Maturity meter installations, real-time monitoring, and reporting
Observation of post-tension tendon placement and stressing
Inspection of reinforcing steel and cells prior to grout placement
Sampling and testing of grout, mortar, masonry units, and masonry prisms
Visual inspection and testing during structural steel framing and field welding
Compressive strength testing of concrete and masonry specimens
The Results
Durable, High-Capacity Parking Infrastructure
Through comprehensive testing, inspection, and monitoring services, Ninyo & Moore, a SOCOTEC Company, supported the construction of a durable, high-capacity parking structure designed to serve the Industry neighborhood.
Key Outcomes:
Quality assurance for high-strength post-tensioned concrete systems
Verified performance of structural concrete and foundations
Real-time monitoring of concrete strength development
Compliance with project specifications and construction standards
Reliable infrastructure supporting parking and future commercial use