AEG, a SOCOTEC Company, provided project management, environmental, surveying, and geotechnical services for the concurrent replacement of two culverts on SR 3002 over Horse Valley Run in Perry County, Pennsylvania.
Key Information
Project Name: SR 3002 Culverts
Client: PennDOT District 8-0
Location: Perry County, Pennsylvania
Services Provided: Geotechnical, Surveying, Environmental, Health & Safety

Talk to our experts
The Challenge
Coordinating Two Culvert Replacements
The SR 3002 project involved the concurrent replacement of two culverts over Horse Valley Run in Perry County, Pennsylvania.
Managing both replacements simultaneously called for careful coordination across multiple technical disciplines while keeping the project on schedule and within budget. An integrated approach was essential to align environmental requirements, field surveys, geotechnical investigations, permitting, and design deliverables.
Environmental considerations were also central to the project, requiring coordination related to waterways, wetlands, threatened and endangered species, and erosion and sediment control.

The Solution
Integrated Engineering and Technical Services
AEG, a SOCOTEC Company, coordinated a multidisciplinary scope of work to support the successful delivery of both SR 3002 culverts replacements.
As Prime Consultant, our team was responsible for project management, planning, cost control, and coordination.
Services and technical deliverables included:
- Waterway and wetland delineation
- Threatened and endangered species agency coordination
- Level 1B Categorical Exclusion documentation
- Erosion and sediment control plans
- Individual NPDES permits for each crossing
- Oversight of Hydrologic and Hydraulic (H&H) reports
- Field surveys and property research, including PA One Call coordination, culverts feature documentation, deed mosaic assembly, preparation of Intent to Enter letters, surveys of existing headwalls and wingwalls, and property ownership and tax map research
- Type, Size, and Location (TS&L) reports for both sites
- Maintenance and Protection of Traffic (MPT) plans
- Boring contract administration
- Geotechnical laboratory testing in AEG’s AASHTO-Accredited and USACE-Validated laboratory
This centralized approach supported the planning and technical requirements associated with both culverts replacements.
AEG, a SOCOTEC Company, coordinated a multidisciplinary scope of work to support the successful delivery of both SR 3002 culverts replacements.
As Prime Consultant, our team was responsible for project management, planning, cost control, and coordination.
Services and technical deliverables included:
- Waterway and wetland delineation
- Threatened and endangered species agency coordination
- Level 1B Categorical Exclusion documentation
- Erosion and sediment control plans
- Individual NPDES permits for each crossing
- Oversight of Hydrologic and Hydraulic (H&H) reports
- Field surveys and property research, including PA One Call coordination, culverts feature documentation, deed mosaic assembly, preparation of Intent to Enter letters, surveys of existing headwalls and wingwalls, and property ownership and tax map research
- Type, Size, and Location (TS&L) reports for both sites
- Maintenance and Protection of Traffic (MPT) plans
- Boring contract administration
- Geotechnical laboratory testing in AEG’s AASHTO-Accredited and USACE-Validated laboratory
This centralized approach supported the planning and technical requirements associated with both culverts replacements.
The Results
Delivering Twin Culvert Replacement Ahead of Schedule
The value of coordinated project planning and multidisciplinary execution was demonstrated by the successful opening of both replacement structures to traffic weeks ahead of schedule.
Through its role as Prime Consultant, AEG, a SOCOTEC Company, supported PennDOT District 8-0 in delivering two replacement culverts while addressing environmental, surveying, geotechnical, permitting, and traffic planning requirements across both sites.